Hi,
Please see photo supplied.
The existing grey pipes were cut into and a radiator was added,hence copper pipes on floor.
The fittings look like Hep2o and i wish to use JG speedfit to match my other work im currently doing.
So im going to erect a wooden frame wall say 8 inches to the left of those grey pipes and the wall will be where you see the blue writing on the floor.
I need to somehow undo these 2 fittings & cap them off "T piece connections will stay" so i can make my new pipe route and continue.
The left pipe i can get off quickly & cap but the right pipe doesnt seem to have much to pipe to play with.
Im not draining down the CH but doing it in situ so im not sure how to tackle the right pipe.
These swivel / rotate fine but now the left one needs to be shorter thean the right one where currently its the other way.
Please see photo supplied.
The existing grey pipes were cut into and a radiator was added,hence copper pipes on floor.
The fittings look like Hep2o and i wish to use JG speedfit to match my other work im currently doing.
So im going to erect a wooden frame wall say 8 inches to the left of those grey pipes and the wall will be where you see the blue writing on the floor.
I need to somehow undo these 2 fittings & cap them off "T piece connections will stay" so i can make my new pipe route and continue.
The left pipe i can get off quickly & cap but the right pipe doesnt seem to have much to pipe to play with.
Im not draining down the CH but doing it in situ so im not sure how to tackle the right pipe.
These swivel / rotate fine but now the left one needs to be shorter thean the right one where currently its the other way.