It’s not even been a year but alas something happened. The two halves of the curtain rail disconnected. The middle edge of one half fell down but I caught it. This put some stress on the batten which has levered away from the wall at the top edge by about half an inch.
There are 7-8 screws along the batten holding it into the wall, and I used some no more nails type stuff.
How can I reinforce the batten without having to take everything down and start again? Ideally I’d want to drill through both batten and wall, insert wall plug and drive in a screw but not sure what sizes to go for.
There are 7-8 screws along the batten holding it into the wall, and I used some no more nails type stuff.
How can I reinforce the batten without having to take everything down and start again? Ideally I’d want to drill through both batten and wall, insert wall plug and drive in a screw but not sure what sizes to go for.