- Joined
- 10 Feb 2023
- Messages
- 10
- Reaction score
- 0
- Country
Unfortunately I may have to reroute and extend a number of 1.5 and 2.5 electrical cables. The cables are under floor boards so will be inaccessible when moved.
I plan to cut the cables one at a time so there is no danger of mixing them up and connect the extra length of wire using permanent Wago or Ideal connectors at both ends. The connectors will be held in plastic boxes and the wire clipped to the joists at entry to the boxes
The wires will be threaded through holes drilled in the centre of the joists.
If the work has to go ahead, Is this the correct processes?
Thanks in advance for any advice.
I plan to cut the cables one at a time so there is no danger of mixing them up and connect the extra length of wire using permanent Wago or Ideal connectors at both ends. The connectors will be held in plastic boxes and the wire clipped to the joists at entry to the boxes
The wires will be threaded through holes drilled in the centre of the joists.
If the work has to go ahead, Is this the correct processes?
Thanks in advance for any advice.