- Joined
- 16 May 2024
- Messages
- 96
- Reaction score
- 1
- Country

I hadn't thought about a joint box near the old CU location. So this saves re laying all the wires to the CU (In most cases, but I may need it yet).The usual way, is to replace the CU, with one large joint box, and connectors/terminals. The tricky part is the new tails, from the meter, to feed the new CU position.
So long as the main tails reach to the new CU location. It's not a ridiculous job.
