I’ve laid a 18mm wbp ply bathroom floor with all board edges meeting on joists. Before tiling I’m going to lay 6mm cement board glued and screwed down to the ply.
Am I right in thinking,
1) the backer boards edges don’t need to meet on a joist, and the screw length only needs to be enough to hit the ply
2) the backer boards don’t need taping/joints filling after fixing them?
Thanks.
Am I right in thinking,
1) the backer boards edges don’t need to meet on a joist, and the screw length only needs to be enough to hit the ply
2) the backer boards don’t need taping/joints filling after fixing them?
Thanks.