I have stripped our bathroom back to bare walls - removing the sand and cement plaster. We need to run new copper and waste pipework - both of which will come up through the floor, for all of the bathroom furniture and will likely be tight up against the wall. Two of the walls are bare brick and two walls are stud work.
What is the best approach to get to a suitable base for tiling (whilst hiding the pipework) from here? Ideally with minimal wall build up.
1a) plasterboard and skim
2a) dot and dab tile backer board
2b) baton and mechanical fix tile backer board
3) something else?
What is the best approach to get to a suitable base for tiling (whilst hiding the pipework) from here? Ideally with minimal wall build up.
1a) plasterboard and skim
2a) dot and dab tile backer board
2b) baton and mechanical fix tile backer board
3) something else?