I need to calculate how much MOT I will need to order for the sub base of my block paved drive.
I will be able to work out the m3 once it's dug out but does anyone know the conversion factor from cubic metre to loose tonne "40mm Down MOT"
Is 2 tonne compacted per m3 about right ?