Working solo and will need to get about 200 concrete tiles up scaffolding for roof replacement.
Can anyone advise on the some ways of get the tiles up?
The scaffolding came with a gin pulley/rope but unsure on how to effectively use this.
Can anyone advise on the some ways of get the tiles up?
The scaffolding came with a gin pulley/rope but unsure on how to effectively use this.