Hi, thanks in advance for any advice.
When we had a new front door installed, we also removed a low wall that previously sat beneath a window. This has left a hole in the floor, which is part of the cavity wall. I now need to fill this hole up to floor level in preparation for applying Mapei Latexplan No Ammonia self-levelling compound throughout the hallway before laying laminate flooring.
I’m using this compound because the hallway previously had asbestos floor tiles, which have now been removed, leaving bitumen behind and this compound I have used before and is suitable for that requirement.
The hole measures approximately 14cm deep, 7cm wide, and 41cm long. It has a cement base at the bottom and brickwork towards the front. Around the top of the hole is a black plastic-type material, which I believe to be a damp-proof course (DPC). From the top of this DPC, there’s a further 2cm gap before reaching the main floor level.
Could anyone please advise on the best way to fill and prepare this hole so it’s ready for the self-levelling compound?
I am also concerned with the fact that this hole has no DPM and would like advice about if I should 1
Many thanks!
When we had a new front door installed, we also removed a low wall that previously sat beneath a window. This has left a hole in the floor, which is part of the cavity wall. I now need to fill this hole up to floor level in preparation for applying Mapei Latexplan No Ammonia self-levelling compound throughout the hallway before laying laminate flooring.
I’m using this compound because the hallway previously had asbestos floor tiles, which have now been removed, leaving bitumen behind and this compound I have used before and is suitable for that requirement.
The hole measures approximately 14cm deep, 7cm wide, and 41cm long. It has a cement base at the bottom and brickwork towards the front. Around the top of the hole is a black plastic-type material, which I believe to be a damp-proof course (DPC). From the top of this DPC, there’s a further 2cm gap before reaching the main floor level.
Could anyone please advise on the best way to fill and prepare this hole so it’s ready for the self-levelling compound?
I am also concerned with the fact that this hole has no DPM and would like advice about if I should 1
Many thanks!