Hi all, didnt get quite the answer i needed on the tiling forum, so thought i would try here.
I am drylining a new bathroom which will be partly tiled. I will put up aquapanel on the tiled areas and m r plasterboard elsewhere. I will tape the aquapanel joints with waterproof tape and then use aquaseal over it prior to tiling.
How do i deal with the joint between the aquapanel (square edged), and the plasterboard (tapered). Do i use normal tape and jointing compound or just cover the joint with the last row of tiles, or both?
Thanks
Jay
I am drylining a new bathroom which will be partly tiled. I will put up aquapanel on the tiled areas and m r plasterboard elsewhere. I will tape the aquapanel joints with waterproof tape and then use aquaseal over it prior to tiling.
How do i deal with the joint between the aquapanel (square edged), and the plasterboard (tapered). Do i use normal tape and jointing compound or just cover the joint with the last row of tiles, or both?
Thanks
Jay