So there I was at the weekend, re-routing the cable supplying the boiler FCU.
Turned off the MCB for the circuit, removed the cable, taped up the cpc - not going to catch me out with that touching N and tripping the RCD, no sir.
Touched the N to a water pipe.
Turned off the MCB for the circuit, removed the cable, taped up the cpc - not going to catch me out with that touching N and tripping the RCD, no sir.
Touched the N to a water pipe.