hi taken all the bathroom out, was fully tiled so knocked all them off. made a few notches along the way with the chisel so filling them with hard wall but also taken some big areas of the render out which goes back to the brick behind it, which is at max 25mm deep, also taken skim off some parts of the ceiling as well.. my questions are..
do i pva then use hard wall building up instages of 8mm to the 25mm depth, scratch it, then fill in the cracks and notches with the hardwall then finish with two coats of board finish?
also where the render on the wall meet the ceiling do i need to put joining tape where they meet before skimming?
the wall has no cavity and i am tiling most of it afterwards, im just doing it for the practice.
pics included. thanks View media item 44066 View media item 44067 View media item 44064 View media item 44063 View media item 44068
do i pva then use hard wall building up instages of 8mm to the 25mm depth, scratch it, then fill in the cracks and notches with the hardwall then finish with two coats of board finish?
also where the render on the wall meet the ceiling do i need to put joining tape where they meet before skimming?
the wall has no cavity and i am tiling most of it afterwards, im just doing it for the practice.
pics included. thanks View media item 44066 View media item 44067 View media item 44064 View media item 44063 View media item 44068