Hi all
I need to replace my lead pipes into my property with plastic. When i do this, i could replace like for like, but with the amount of other work i am doing i can make some changes.
The current pipe runs under the floor in the void where it is cold, so in the winter when the boiler is used most, the water is very cold and the boiler has to work harder to heat it.
Would it be worth running the boiler supply pipe into the main living area first so it will warm up before it gets to the boiler? Would it save much, and is it worth it?
I have a route that would keep it concealed. Would alsmost be a 'pre-heater' for the water.
Thanks
Huw
I need to replace my lead pipes into my property with plastic. When i do this, i could replace like for like, but with the amount of other work i am doing i can make some changes.
The current pipe runs under the floor in the void where it is cold, so in the winter when the boiler is used most, the water is very cold and the boiler has to work harder to heat it.
Would it be worth running the boiler supply pipe into the main living area first so it will warm up before it gets to the boiler? Would it save much, and is it worth it?
I have a route that would keep it concealed. Would alsmost be a 'pre-heater' for the water.
Thanks
Huw
