Due to various reasons, work stopped and started and it took a long time to get to pretty much finished, but has not been signed off by the building regulators.
The main reason for this (and its not really an excuse I know!) but he never really seemed interested, I'd call him and he would say nope don't need to see this, or don't worry about that I'll come where you get to this stage etc and in all honesty, I think I just forgot to get him back in and by the time I'd realised we are pretty much done with it all.
My question is, would it be feasible to still get him back in to sign it off if he hasn't seen the work? Or even get someone else to do it? Or am I facing a potential situation where it will all have to be demolished or stripped back?
I've taken pictures of all the necessary parts like fireboarding rsj's and the external waste pipe work and everything has been done as instructed on the building plans. Would this be acceptable as proof the works been done properly?
The main reason for this (and its not really an excuse I know!) but he never really seemed interested, I'd call him and he would say nope don't need to see this, or don't worry about that I'll come where you get to this stage etc and in all honesty, I think I just forgot to get him back in and by the time I'd realised we are pretty much done with it all.
My question is, would it be feasible to still get him back in to sign it off if he hasn't seen the work? Or even get someone else to do it? Or am I facing a potential situation where it will all have to be demolished or stripped back?
I've taken pictures of all the necessary parts like fireboarding rsj's and the external waste pipe work and everything has been done as instructed on the building plans. Would this be acceptable as proof the works been done properly?