I'm seeing more and more use of cavity trays all the way round a build at dpc level rather than two level DPC's (inner/outer leaf) with angled lean mix concrete.
Just wondering why things have changed more towards a massive tray all the way round.....
Just wondering why things have changed more towards a massive tray all the way round.....