It is part single part two storey but where the patio doors will be, is a single storey. The first image below shows my first architect's rendered image except where there is a small step back on the extension where the two glass panes meet, is now a brick pier which is now reflected in the second architect's image (together with the two storey).
Where there is no glass patio in a flush threshold, there will be brick as shown in the second image. The French doors will have a flush threshold too.
I'm a little confused though, if I understand correctly, a cavity tray is used to catch dripping water or moisture within a cavity? How does it get rid of it?
To be honest, I don't know what I'm talking about as this so new to me but I'm just reiterating what my builder said to see if others more knowledgable than me, agree.
All I'm asking is if we are having a flush threshold where the patio doors open and where the DPC brick level is two courses above the ground surface with LBC bricks then on top of the two layers of ground level DPC, is a cavity tray still needed?
If you need to find a tradesperson to get your job done, please try our local search below,
or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Please select a service and enter a location to continue...
Are you a trade or supplier? You can create your listing free at DIYnot Local