Quick question. Can a new central heating system be fitted in one day?
It will be fitted in an empty (no furniture etc) 3 bed semi that's had all previous ch system, pipes and rads removed already. Floorboards are up where old pipes went (notches in joists could be reused as all of the new upstairs rads will be in same place, downstairs floor is solid)
Assuming plastic pipes will be used due to timeframe?? Also assume loads of pushfits ( any views on modern pushfits?) will be used due to timeframe (would prefer copper and soldered joints but surely this wouldn't be possible in one day??)
Combi
New pipework
9 Rads
Cheers
It will be fitted in an empty (no furniture etc) 3 bed semi that's had all previous ch system, pipes and rads removed already. Floorboards are up where old pipes went (notches in joists could be reused as all of the new upstairs rads will be in same place, downstairs floor is solid)
Assuming plastic pipes will be used due to timeframe?? Also assume loads of pushfits ( any views on modern pushfits?) will be used due to timeframe (would prefer copper and soldered joints but surely this wouldn't be possible in one day??)
Combi
New pipework
9 Rads
Cheers