I have a 6”x6” adaptable box that currently has only steel conduit connections to it. I need to add T&E. What’s the right way to do that?
In particular, what’s the “right way” to terminate the new cable’s earth? The box doesn’t have an earth terminal.
Also, what are the requirements for strain relief? Am I required to use a gland?
Finally, are there any connectors that I can use inside the box that are considered maintenance-free?
I’m aware of various possibilities but I’d love to hear what the best practice is. Thanks.
In particular, what’s the “right way” to terminate the new cable’s earth? The box doesn’t have an earth terminal.
Also, what are the requirements for strain relief? Am I required to use a gland?
Finally, are there any connectors that I can use inside the box that are considered maintenance-free?
I’m aware of various possibilities but I’d love to hear what the best practice is. Thanks.

