Hi can someone offer advice, we should hear shortly if we have planning permission to convert our stable block into a granny annexe. I would like to do as much as possible with the build and now want to know how much I am allowed to do with the electrics.
I believe I need this all signed off by an electrician but am i allowed to do the work and get the final check completed by an electrician or is that a definite no no. if i am allowed to do anything can someone explain to me what that is. Or point me in the direction of where i can find out.
Thanks
Cliff
I believe I need this all signed off by an electrician but am i allowed to do the work and get the final check completed by an electrician or is that a definite no no. if i am allowed to do anything can someone explain to me what that is. Or point me in the direction of where i can find out.
Thanks
Cliff