Correcting botched paintwork: once cured or ASAP?

Joined
12 Nov 2026
Messages
4
Reaction score
0
Country
United Kingdom
Hi everyone!

We've had some disappointing paintwork from our decorator (pics attached)

I'm hoping it's down to rushing rather than lack of ability, and that he can put things right

My understanding is that paint can take several weeks to fully cure, and that sanding, touching up or repainting too soon can make things worse.

However, our decorator wants to come back within a week, while the paint is still relatively fresh.

In case like these, is it generally better to rectify defects while the paint is fresh, or wait until it's fully cured?

Interested to hear from the experts! Thanks!
 

Attachments

  • Screenshot_20261112-212448.png
    Screenshot_20261112-212448.png
    949.8 KB · Views: 40
  • Screenshot_20261112-212503.png
    Screenshot_20261112-212503.png
    1.6 MB · Views: 41
  • Screenshot_20261112-212519.png
    Screenshot_20261112-212519.png
    1.6 MB · Views: 41
  • Screenshot_20261112-212552.png
    Screenshot_20261112-212552.png
    2.4 MB · Views: 39
  • Screenshot_20261112-212637.png
    Screenshot_20261112-212637.png
    2.8 MB · Views: 39
  • Screenshot_20261112-212649.png
    Screenshot_20261112-212649.png
    2.4 MB · Views: 36
Some masq purple masking would of improved lines greatly.
Plastic razor scraper and Pretty boy paint remover (water based) get that mess off floor and windows. Id start now.
Test areas first with paint remover.
Oil based paint you will need to give it 3+ weeks. Going to be harder to remove though. Low price and rushing the problem? Looks like a amateur job though
 
Thanks Wayners

Were recommended. I honestly don't know how it went so wrong?! A registered company, not just some guy with a paintbrush!

I've wiped the windows with a warm, damp cloth and carefully removed the paint from the frames using wooden cuticle pushers. It took forever, but they look considerably better now! ☺️ Only 4 more windows to go...

Haven't gone near the window sills or skirtings. There's nothing I can do to fix how they look!

They're coming back in a few days to touch up, but I feel they should wait for it to cure first. They're insistent on coming back sooner, hence my post to gauge opinion...

With 3 weeks, you're on the "cure first" side
 
I wonder if there was a new starter and your job was the test run. If it's a company with a boss and minions..
 
I wonder if there was a new starter and your job was the test run. If it's a company with a boss and minions..
The boss came over today. The work was indeed carried out by one of his guys. He didn't use the word "minion" :giggle:

I spent 30 hours cleaning paint off every surface over the past six days. Have never spent this much time cleaning, even when my in-laws come over! Starting to look a little more presentable now...

They redid the two worst walls. More work next week
 
Last edited:
I do hope that was a low budget job. The decorator doesn't seem to have spent much time on the prep. It seems likely that the finish was rough before he started.

Image 2- I am only guessing... he applied the first coat of waterbased satin(?) and then decided to sand it with 80(?) grit paper which ripped the surface of the paint.

I think it is waterbased paint because you can see fisheyes in image 2 and 3. A common reason (but not exclusively) for fisheyes is contaminates such as silicone or grease on the surface.

Image 5- dig your fingernail into the drips. If your fingernail leaves a dent the drip is new, if not, it was there before.

Image - looks like a vanity unit- the top and front seem to have been siliconed to the wall. Silicone repels paint. I get really annoyed with fitters who do not understand that. Nevertheless the paint finish/cutting in is awful.

Without knowing what you paid, I do not want to be too harsh on the decorator, he may have been told that he only had one day per room and that he needed to tosh it. The dot of paint on the floor certainly looks new. The paint on the windows- are you sure they weren't there before?

I tend to quote an average of 5 days for a bedroom in a Victorian property (with original sliding sash windows). That includes 2.5 days of sanding/filling/sanding. A brand new build bedroom with finished windows, decent plastering and woodwork, two days (in part because I use oil based paint for the woodwork).
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top