Hi - I have used this forum in the past for projects and feedback has been useful. I have been asked by a neighbour to assist with a rear (possibly side extension) at a property which is located within a National Park.
The plan is for under Stage A to completely demolish an existing ground floor original outside WC (approx 1x1m). Stage B will be to then build a 3m deep extension as shown on the drawing.
The question is...is the extension which would usually be classed as Permitted Development stay as just a rear extension or would it also be classed as a side extension to the original outbuilding and therefore need Planning Consent as located within a National Park?
Any feedback or experience would be really useful.
Kind Regards, Ian
The plan is for under Stage A to completely demolish an existing ground floor original outside WC (approx 1x1m). Stage B will be to then build a 3m deep extension as shown on the drawing.
The question is...is the extension which would usually be classed as Permitted Development stay as just a rear extension or would it also be classed as a side extension to the original outbuilding and therefore need Planning Consent as located within a National Park?
Any feedback or experience would be really useful.
Kind Regards, Ian