Job is to install 6 a/c units in Bradford.
Firstly just to be 100% clear we have to use a certified electrician so I'm not looking to get it done by us using your assistance.
my local electrician who assisted on the costing but isn't really interested in doing the job as he's v busy and doesn't like to travel/stay away.
Bad point is he is away till monday and his/our price has been accepted but the client has come back and requested additions:
"each new system to have distribution board timer & power meter"
Now I can see a MG timer is around 100 and I can allow 50 quid for fitting on top but I can't be sure of what they need for the PM side. I have found these:
http://www.pce-instruments.com/engl...-n30p-1-1-det_389002.htm?_list=kat&_listpos=1
But not sure if this is what they want (to get energy useage)
Finally if there is a sparks in the Bradford area who can assist on this project we'd welcome quotes. Work expected to start end of July.
Job is to install 6 a/c units in Bradford.
Firstly just to be 100% clear we have to use a certified electrician so I'm not looking to get it done by us using your assistance.
my local electrician who assisted on the costing but isn't really interested in doing the job as he's v busy and doesn't like to travel/stay away.
Bad point is he is away till monday and his/our price has been accepted but the client has come back and requested additions:
"each new system to have distribution board timer & power meter"
Now I can see a MG timer is around 100 and I can allow 50 quid for fitting on top but I can't be sure of what they need for the PM side. I have found these:
http://www.pce-instruments.com/engl...-n30p-1-1-det_389002.htm?_list=kat&_listpos=1
But not sure if this is what they want (to get energy useage)
Finally if there is a sparks in the Bradford area who can assist on this project we'd welcome quotes. Work expected to start end of July.