Wondering if its a problem with these measurements.
Cavity wall, 100-100-100. Concrete filled, then beam and block.
First line of wall ties 600 above concrete fill.
DPC at 275 above FFL. ( this is one block above wall ties ).

Thanks.
 
Sponsored Links
Wondering if its a problem with these measurements.
Cavity wall, 100-100-100. Concrete filled, then beam and block.
First line of wall ties 600 above concrete fill.
DPC at 275 above FFL. ( this is one block above wall ties ).

Thanks.
The wall ties should correspond with the insulation increments and typically start at floor level DPC, with the first set of ties supporting the first row of insulation.
 
Crap drawing but it gives you the idea. I haven't shown any lean mix cavity fill but this would typically finish 225mm below external ground level.

 
Sponsored Links
Its a sloping site, and at the worst part im already well over a metre before beam and block.
That is very similar to what i think i will do. Im probably going with first ties sat on beam and block, that way my 50mm insulation will correspond with 100mm floor insulation. Then one block with dpc on top of that and next block with ties again.
Thanks a lot noseall for the time you took.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top