I am laying some insulation boards then a heat mat followed by a latex screed then Amtico flooring. The Heatmiser room stat has a heat probe which it is recommended should be located as close the centre of the room as possible but I understand the probe should not cross the heat map wires so how do I get the probe to the centre?! Should I channel the insulation board below the mat and lay the probe wire in that or should it be laid in the latex screed on top?
One other thing: the probe is supplied with only 3m of cable but that can be extended using Beldon 8451 twisted twin cable. Can that be joined satisfactorily under the floor?