Hi Chaps, advice apreciated.
We have recently had an extension done to my daughters property. Amongst other thing the old kitchen has now become a dining room and a new kitchen added.
Stopcock, and mains infeed water moved 3 metres.
The old earth to the cold feed which I assume ran directly back to the consumer unit is still in the original position, this was 25 years old and I think 6mmsq.
Can someone clarify what is needed to bring this up to part p spec, the builder didn't allow for anything in this respect within his quote and is now trying to claw back extras.
Am I right in thinking the earth now has to be replaced with a continous run of 10mm cable to the new water main
We have recently had an extension done to my daughters property. Amongst other thing the old kitchen has now become a dining room and a new kitchen added.
Stopcock, and mains infeed water moved 3 metres.
The old earth to the cold feed which I assume ran directly back to the consumer unit is still in the original position, this was 25 years old and I think 6mmsq.
Can someone clarify what is needed to bring this up to part p spec, the builder didn't allow for anything in this respect within his quote and is now trying to claw back extras.
Am I right in thinking the earth now has to be replaced with a continous run of 10mm cable to the new water main