Hi, looking for and advice as to how to proceed. Read the guides but the hole might be too deep at max 60mm.
Removed a kitchen and the subfloor wasn't level under old sink. There's a rectangular hole roughly 1100mm x 500mm x up to 60mm. Original DPM has deteriorated, brick is visible on outside wall.
Im unsure of order of operations and where to place a new dpm. The hole is too deep for normal self leveling and maybe too shallow for standard concrete. Plan was liquid dpm with a sand mix, prime, deep fill self level, prime, smoothing compound. But unsure about outside wall and bitumen.
Advice appreciated.
Removed a kitchen and the subfloor wasn't level under old sink. There's a rectangular hole roughly 1100mm x 500mm x up to 60mm. Original DPM has deteriorated, brick is visible on outside wall.
Im unsure of order of operations and where to place a new dpm. The hole is too deep for normal self leveling and maybe too shallow for standard concrete. Plan was liquid dpm with a sand mix, prime, deep fill self level, prime, smoothing compound. But unsure about outside wall and bitumen.
Advice appreciated.