Filling in hole then patio over

Discussion in 'In the Garden' started by S_workman, 30 Jun 2018.

  1. S_workman

    S_workman

    Joined:
    30 Jun 2018
    Messages:
    1
    Thanks Received:
    0
    Country:
    United Kingdom
    Hi all.

    I have dug out a 2m x 1.5m x .5m hole on a concrete patio to access the sewer pipe as we are adding an ensuite and require to run our new soil pipe:

    [​IMG][/IMG]

    http://i65.tinypic.com/2cr3ul2.jpg

    The clay section is being replaced in PVC by our plumber and encased in concrete due to the proximity to the surface and the fact that we plan to lay some nice sandstone slabs after we remove the rest of that hideous concrete.

    My question is what should I fill the hole that I have dug with? The soil is very heavy clay and being a victorian cottage the foundations are very shallow with stepped brick footers directly on to the clay from what I can see. I am worried I will damage the foundations by changing the water content of the clay or by whacking down agregate so close to the foundations. Can I just fill with type 1 compacting every few inches or is .5m of type 1 unrealistic?

    Thanks,

    Scott
     
  2. Sponsored Links
  3. lonner

    lonner

    Joined:
    14 Jan 2010
    Messages:
    290
    Thanks Received:
    51
    Location:
    Cambridgeshire
    Country:
    United Kingdom
    Type 1 MOT ,or lean mix concrete ,10:1 mix, both would need compaction.
     
  4. DIYnot Local

    DIYnot Local

    Joined:
    3 Sep 2019
    Country:
    United Kingdom

    If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

    Select the supplier or trade you require, enter your location to begin your search.


    Are you a trade or supplier? You can create your listing free at DIYnot Local

     
Loading...

Share This Page