Hi
I'm just building a frame to make a floor level - because the original house floors drop away quite significantly.
I've laser mapped the floor and cut the fillets to measure, the end nearest the door skims down to a few mm and then on to latex, whereas the far end has raised about 7" (it's all now perfectly level!). On top will be fitted 25mm hardwood ply, and then LVT final floor. (The ply already down on the latex section will have 1200g DPM under - I've just tried it up to fit first).
Just some questions if anyone can help me please....
I'd like to put some insulation in to help both the heat retention and to deaden the hollow sound - especially in the highest parts. Buildings regs aren't keen on this, maybe because the insulation cannot fill the entire floor? Would anyone know if I can insulate this or do something to avoid the hollow sounds? Possibly just chuck in all the offcuts of insulation to reduce the air volume or is that a bit mad??
I don't want to stagger the boards as I wanted two complete length boards across the frequently used door entrance section, would anyone think that staggering boards should really be necessary given the 25mm size ply I'm using?
Anything else to comment before I start glueing and screwing this lot down please?
Thanks,
Dave
I'm just building a frame to make a floor level - because the original house floors drop away quite significantly.
I've laser mapped the floor and cut the fillets to measure, the end nearest the door skims down to a few mm and then on to latex, whereas the far end has raised about 7" (it's all now perfectly level!). On top will be fitted 25mm hardwood ply, and then LVT final floor. (The ply already down on the latex section will have 1200g DPM under - I've just tried it up to fit first).
Just some questions if anyone can help me please....
I'd like to put some insulation in to help both the heat retention and to deaden the hollow sound - especially in the highest parts. Buildings regs aren't keen on this, maybe because the insulation cannot fill the entire floor? Would anyone know if I can insulate this or do something to avoid the hollow sounds? Possibly just chuck in all the offcuts of insulation to reduce the air volume or is that a bit mad??
I don't want to stagger the boards as I wanted two complete length boards across the frequently used door entrance section, would anyone think that staggering boards should really be necessary given the 25mm size ply I'm using?
Anything else to comment before I start glueing and screwing this lot down please?
Thanks,
Dave