Hi all
I have a flat roof on my house (just purchased) which covers the kitchen sink. It has been done with felt with is cemented into the bricks which looks an absolute mess. To cover this I have managed to acquire some substitute flashing which I will have a go at installing in the next couple of weeks.
What I would like to know is once I have removed the pointing from where to insert the lead:
How far do I need to insert it into the brick
How do I finish the pointing?
Cheers
Jacka
//media.diynot.com/188000_187557_46117_78597100_thumb.jpg
I have a flat roof on my house (just purchased) which covers the kitchen sink. It has been done with felt with is cemented into the bricks which looks an absolute mess. To cover this I have managed to acquire some substitute flashing which I will have a go at installing in the next couple of weeks.
What I would like to know is once I have removed the pointing from where to insert the lead:
How far do I need to insert it into the brick
How do I finish the pointing?
Cheers
Jacka
//media.diynot.com/188000_187557_46117_78597100_thumb.jpg