- Joined
- 29 Nov 2008
- Messages
- 351
- Reaction score
- 29
- Country
Hi all
Wife wants a vanity unit to replace the current pedestal basin in the bathroom.
Ive lifted the floor and there is a 50mm wall hanger/joist that runs behind the basin left to right directly along the external block the wall.
The vanity units seem to have a really tight tolerance for squeezing the waste and supply up the wall behind them. Sometimes only like 70mm.
How do you pro's get around this as with the joist and 32mm waste pipe il probably need 100mm minimum?
Wife wants a vanity unit to replace the current pedestal basin in the bathroom.
Ive lifted the floor and there is a 50mm wall hanger/joist that runs behind the basin left to right directly along the external block the wall.
The vanity units seem to have a really tight tolerance for squeezing the waste and supply up the wall behind them. Sometimes only like 70mm.
How do you pro's get around this as with the joist and 32mm waste pipe il probably need 100mm minimum?