Hi
I have chopped an old pipe out of the kitchen floor and want to sreen it.
I have a bag of wicks sharp sand and Master original cement.
On the bag of wicks sharp sand it says the mix is 8 bags of sharp sand to one 50kg bag of cement.
The problem is I only want enough to screed a small area in the kitchen not the whole house.
What mix should I be using ?
4 sand to 1 cement
5 sand to 1 cement
It is being layed over concrete and brick and I have damp proofed the small area just incase.
I have chopped an old pipe out of the kitchen floor and want to sreen it.
I have a bag of wicks sharp sand and Master original cement.
On the bag of wicks sharp sand it says the mix is 8 bags of sharp sand to one 50kg bag of cement.
The problem is I only want enough to screed a small area in the kitchen not the whole house.
What mix should I be using ?
4 sand to 1 cement
5 sand to 1 cement
It is being layed over concrete and brick and I have damp proofed the small area just incase.