Hi
I have lifted old tiles in toilet and noticed that there had been a waste pipe had been added at some point leaving the floor uneven.
I hammered out part of the old floor and new cement laid where pipe had been installed.
I have it as level as I could get it and when I place a tile on it (no adhesive) there is mm in the levels.
Would you put self leveling compound down or when the adhesive is laid the tile will sit perfect?
Thanks