Hi all I am starting to dig my footings this weekend but while I have the machine I was Going to dig the over site out aswell my drawings for my foundations are 1m down etc is this from finish floor level
My second question the over site my architect is suggesting is around 470mm below ffl down I thought I could kill 2 birds with one stone reduce dig it down and then dig the foundations around 600mm less or would I then have to go meter down from digging the over site