I was in discussions today about gas supplies. This is a 3 story block of flats (oops sorry - apartments). The gas meters are in groups of 3 in wedge shaped meter boxes at ground level and dotted around the building, the pipes run from the meters vertically up the outside of the building and enclosed in semi-circular capping big enough to accommodate the 3 pipes and their 10mm bonds.
My question is - should the 3 services be bonded together or left separate? The U/G feed is plastic.
My question is - should the 3 services be bonded together or left separate? The U/G feed is plastic.