Okay, carrying out a PIR this last week.
Begin the Upstairs lighting circuit.
Continuity (R1 + R2) fine.
Move to IR, reading dancing around the 2.3MOhms mark.
So thinking mmm, possible stuffed cable.
Carrout a continuity between Phase and Neutral (at the CU)
The meter is making and breaking continuously with no time for a value to register.
Q. What was causing this??
Begin the Upstairs lighting circuit.
Continuity (R1 + R2) fine.
Move to IR, reading dancing around the 2.3MOhms mark.
So thinking mmm, possible stuffed cable.
Carrout a continuity between Phase and Neutral (at the CU)
The meter is making and breaking continuously with no time for a value to register.
Q. What was causing this??