- Joined
- 27 Jan 2008
- Messages
- 28,446
- Reaction score
- 3,456
- Location
- Llanfair Caereinion, Nr Welshpool
- Country

@morqthana link says:-
"UK wiring regulations effectively banned them without an electrician’s sign-off, but the government’s intervention changes all that." I have not seen any wiring regulations which stipulates what can be plugged in.
There may well be supply regulations which stop it, or HSE regulations, and we need to see exactly what is going to be changed, Plug and play basically points to a single item which plugs in, without any CT coils etc, at the meter. And what we want to know, is will those without the second MPAN number already, get something which allows them to be paid for export, and what will be the export limit?
"UK wiring regulations effectively banned them without an electrician’s sign-off, but the government’s intervention changes all that." I have not seen any wiring regulations which stipulates what can be plugged in.
There may well be supply regulations which stop it, or HSE regulations, and we need to see exactly what is going to be changed, Plug and play basically points to a single item which plugs in, without any CT coils etc, at the meter. And what we want to know, is will those without the second MPAN number already, get something which allows them to be paid for export, and what will be the export limit?