My daughter has a ideal logic combi that has air in the system and i believe needs pressursing Her partner has done one and we need it running It was fine but he chose to take a rad of for decorating and that i believe is were the bleeding is needed Can you tell me how to get the presure back and bleed the system in the correct order All i have is a sticker on the boiler that says"bar 1.5 to 2 open blue open black many thanks