Good morning all,
I hope this is in the right section. I was offered by a friend to help tile my shower room before he went away, he tiled the room from floor to ceiling, doing a very nice job indeed. However now the time has come to install my shower tray, and I have read that the tray was meant to be installed before the tiling? What are my options now, are they: 1) Grind the tiles out needed to slot the tray underneath, 2) Take the whole bottom row of tile out from the grout line, fix tray, tile back down to tray 3) Butt the tray upto the tile, then use silicon/trim to cover any slight gap between tray and tile?
Hope this makes sense.
Scottyboyiow
I hope this is in the right section. I was offered by a friend to help tile my shower room before he went away, he tiled the room from floor to ceiling, doing a very nice job indeed. However now the time has come to install my shower tray, and I have read that the tray was meant to be installed before the tiling? What are my options now, are they: 1) Grind the tiles out needed to slot the tray underneath, 2) Take the whole bottom row of tile out from the grout line, fix tray, tile back down to tray 3) Butt the tray upto the tile, then use silicon/trim to cover any slight gap between tray and tile?
Hope this makes sense.
Scottyboyiow