I assume drains should go below hardcore. What would be minimum depth? I'd like to get main drain (that will collect all waste from first floor) under the floor in a garage, then it will need to go under approx 3m wide extention. To plan opening depth and size in a foundation, I need to know what minimum starting depth is.
thanks.
v.
thanks.
v.