How long??????

Joined
16 May 2004
Messages
216
Reaction score
5
Location
Edinburgh
Country
United Kingdom
Have just laid some 600*900mm 16mm? slate flags on sand/cement(3:1 mix)+diluted PVA to guage onto a dry but PVA sealed screed. Roughly how long before light traffic? Started off at approx. 3/4" but making a gentle slope to remove a small step resulted in about a 3.5" bed for a bit. Unfortunatly it is in the middle of the house and therefore the normal way between kitchen/upstairs so hopefully not too long!!! :rolleyes: :rolleyes: :rolleyes:

David
 
Sponsored Links
sand cement screed will go off within 24 hrs. it won't achieve full strength for 28 days.

given that i think i would probably leave it for 3 days.

if you can't wait then i would put down some strips of plywood as walkways for a while.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top