I am aware this may be a very ambiguous question and there may be no way of answering it but if anyone feels they can offer some idea i'd be most greatful. I was wondering if anyone can give me idea how long it'll take to build an extension? Its a two storey extension on the rear of an existing house. It will contain a new utility room, shower/wc, hallway and a dining room on the ground floor and two new bedrooms on the first floor. The existing stairs will be taken out of the house and a new staircase provided in the extension. The new floor area provided will be 78sq.m. The walls will be faced in natural limestone externally and the roof (which hips into the original roof at 90deg.) will be covered with blue slate. There will be 4 new opening between the existing house and the extension (existing walls 550mm thick).
I realise its very difficult to estimate as there are numerous factors which will affect the build period, not least the number of people working on the job but if someone can tell me, is it likely to take 4weeks? 6 weeks? 6months?? Just a very rough idea? I understand if its just not possible to guess but if anyone can it'd be a great help.
I realise its very difficult to estimate as there are numerous factors which will affect the build period, not least the number of people working on the job but if someone can tell me, is it likely to take 4weeks? 6 weeks? 6months?? Just a very rough idea? I understand if its just not possible to guess but if anyone can it'd be a great help.