Hello. New here and this is my first post.
I have almost completed a loft conversion in my own home. All pipework and rads are in place. Soon I need to connect up my new plumbing to the existing flow and return pipe stubs ends coming up from downstairs.
My question is :
How do I get the pressure out of the existing system, in order that I can remove the speed fit stop ends currently on the flow and return pipes ?
I do not want to drain down the whole system - just remove enough pressure so as to stop getting my hands wet up in the new loft. !
Advice would be gratefully received !
I have almost completed a loft conversion in my own home. All pipework and rads are in place. Soon I need to connect up my new plumbing to the existing flow and return pipe stubs ends coming up from downstairs.
My question is :
How do I get the pressure out of the existing system, in order that I can remove the speed fit stop ends currently on the flow and return pipes ?
I do not want to drain down the whole system - just remove enough pressure so as to stop getting my hands wet up in the new loft. !
Advice would be gratefully received !