Hi Everyone,
Currently DIY'ing the bathroom in my 1970's bungalow. I have removed the non load bearing wall between toilet and shower room.
What is the best way to make the blockwork flush enough for plastering? Is it a case of chiselling away so there is enough of a recess?
Thanks