I've fitted several of these for new window openings (mostly 900mm ones), but now I have to fit a 2.7m one due to opening up kitchen to new extension through original outside cavity wall.
I see two options:
1: to slide up lintel from below in to the cavity (means I have to remove what would be the tops of the two pillars, prop up lintel and rebuild pillars)
2: remove bricks from one skin, remove mortar from other skin, and slide in lintel from one side. then rebuild the 3 course on the one side.
Any other optons? I've used option 2 in the past, but obviously with this size lintel it means remove three courses of bricks and then rebuilding up. with a 600mm window opening its only a few bricks to patch it up again
What would you pro's do? I'm using 3 akros and strongboys
I see two options:
1: to slide up lintel from below in to the cavity (means I have to remove what would be the tops of the two pillars, prop up lintel and rebuild pillars)
2: remove bricks from one skin, remove mortar from other skin, and slide in lintel from one side. then rebuild the 3 course on the one side.
Any other optons? I've used option 2 in the past, but obviously with this size lintel it means remove three courses of bricks and then rebuilding up. with a 600mm window opening its only a few bricks to patch it up again
What would you pro's do? I'm using 3 akros and strongboys