- Joined
- 5 Dec 2012
- Messages
- 815
- Reaction score
- 9
- Country
-
I am putting my shower tray in soon,, having just raised levelled my floor joists to make the floor level.
the shower drain plug will be 2.6m away from the exit of the pipe from the house
where the waste pipes currently exit the house, they are 5cm LOWER than the top of the joists, so once i have put my 22mm chipboard on, followed by mortar bed and the shower tray, do you think this is enough all?
the shower drain plug will be 2.6m away from the exit of the pipe from the house
where the waste pipes currently exit the house, they are 5cm LOWER than the top of the joists, so once i have put my 22mm chipboard on, followed by mortar bed and the shower tray, do you think this is enough all?