is this fall enough for flush shower tray?

Joined
5 Dec 2012
Messages
927
Reaction score
13
Country
United Kingdom
I am putting my shower tray in soon,, having just raised levelled my floor joists to make the floor level.

the shower drain plug will be 2.6m away from the exit of the pipe from the house

where the waste pipes currently exit the house, they are 5cm LOWER than the top of the joists, so once i have put my 22mm chipboard on, followed by mortar bed and the shower tray, do you think this is enough all?
 
Sponsored Links
Well you haven't said how deep your joists are, so it's not really possible to answer that question. Ideal fall is 44mm per metre, so 115mm along the length in your case
 
7 inch joists but the waste exists at old floor level, so 3inch lower than where shower will be.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top