Right folks: Looking to lay central heating (22/15mm) and Hot/Cold water pipes in a 3-bed semi.
The usual stuff: feeding pipe through joists with the tales to rads coming up in copper.
I last did this in 2012 with JG Speefit without issue but I'm wondering if it's worth switching to Hep2O if there's an obvious or even slight benefit (I don't mind paying the extra for Hep20)?
Any advice/suggestions would be appreciated.