not saying it is BAS, but with respct, us non domestic electricians don't really often have to deal with the stuff that's geared towards domestic installations such as RCD's on most circuits..
stuff we put in is largely in conduits of trunking, or under the supervision of instructed persons etc..
the last piece of T+E I put in ( besides my own kitchen ) was probably 8 years ago now..
stuff we put in is largely in conduits of trunking, or under the supervision of instructed persons etc..
the last piece of T+E I put in ( besides my own kitchen ) was probably 8 years ago now..