- Joined
- 26 Jul 2015
- Messages
- 242
- Reaction score
- 4
- Country
Hi,
I'm doing a refit of existing kitchen and will be going to bear bones and plugs/socket work.
Digram of existing sockets is above (not to scale)
My questions for anyone who is willing to help;
1. I need to move the fuse spur for the fridge (not shown plug behind fridge I'm assuming is there). This needs to move right about 30 odd CM's to accommodate new cupboards. Am I going to need to channel out and relay this cable to extend back to the main ring? OR Can I wire into this existing and chain to a new socket?
2. I'd like a socket next to the fuse spur I need to move, is this going to be feasible ?
3. I've got under cabinet lights I'm seeing connected to a fuse spur, i'm thinking this might be moveable to the Radial lighting circuit rather than off mains, is this going to be changeable to a 2 gang ?
4. Where do you think the wiring routes here? is there any particular standard for this? I'm trying to work out what I've got to channel out.
I will be getting this all signed off and verified first of all, luckily I have a qualified friend I'm just trying to work out this stuff and think on my own two feet.
I'm doing a refit of existing kitchen and will be going to bear bones and plugs/socket work.
Digram of existing sockets is above (not to scale)
My questions for anyone who is willing to help;
1. I need to move the fuse spur for the fridge (not shown plug behind fridge I'm assuming is there). This needs to move right about 30 odd CM's to accommodate new cupboards. Am I going to need to channel out and relay this cable to extend back to the main ring? OR Can I wire into this existing and chain to a new socket?
2. I'd like a socket next to the fuse spur I need to move, is this going to be feasible ?
3. I've got under cabinet lights I'm seeing connected to a fuse spur, i'm thinking this might be moveable to the Radial lighting circuit rather than off mains, is this going to be changeable to a 2 gang ?
4. Where do you think the wiring routes here? is there any particular standard for this? I'm trying to work out what I've got to channel out.
I will be getting this all signed off and verified first of all, luckily I have a qualified friend I'm just trying to work out this stuff and think on my own two feet.