Laths, plaster, plasterboard then tiles!? What to do

when all the laths are removed is a good time to run any pipework in the wall before boarding. saves boxing in at the end if you can get your hot and colds in just the right places.

You won't believe what a nightmare you just saved me from! I was about to board up the floor, and plasterboard the wall, and hadn't even considered the pipework. Which was very silly, as I'm moving the toilet a few feet. I've never done this before so could easily have missed it.

Thank you! I just ordered a load of speed fit stuff and solvent weld waste pipe bits. I had to youtube a few things but tomorrow I'll extend and run everything in the wall cavity. Phew!
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top